Skip to content
Healthcare SoftwareEngineering

Lifecycle guide

The Healthcare Software Development Life Cycle (SDLC)

Every healthcare product needs a disciplined lifecycle, but software that meets the FDA device definition needs a formally regulated one. Knowing which you are building determines how much documentation, traceability, and change control the process must carry.

11 min read Updated

Two kinds of healthcare SDLC

Healthcare software falls into two broad lifecycle regimes. The first covers products that are not medical devices — patient portals, scheduling, revenue cycle, most integration services, many analytics tools. They follow a well-run SaaS lifecycle with added security and privacy controls. The second covers software that is a medical device or part of one. That software is built under a quality management system, with IEC 62304 commonly used as the recognized lifecycle standard.

The distinction is not about how serious the product feels. A scheduling system can be mission-critical without being a device. A modest image-measurement tool can be a device. Classification depends on intended use, and regulatory counsel should confirm it early.

Regulated SDLC versus ordinary SaaS SDLC

How lifecycle practices differ
PracticeOrdinary SaaS SDLCRegulated device software SDLC
PlanningRoadmap and sprint planningDocumented software development plan under the QMS
RequirementsUser stories with acceptance criteriaSoftware requirements specification traced to system requirements and risk controls
ArchitectureDiagrams and ADRs, often informalDocumented software architecture identifying software items, interfaces, and SOUP
Risk managementSecurity and business risk discussionsISO 14971 risk management integrated with software hazards and controls
VerificationAutomated tests; coverage as a team goalDocumented verification at unit, integration, and system level, scaled to safety class
TraceabilityTicket links, often partialBidirectional traceability: requirement to design to code to test to risk control
Third-party codeDependency scanningSOUP identified, with requirements and known anomalies evaluated
ReleaseContinuous deploymentFormal release with documented known anomalies and archived build
Change controlPull request reviewChange requests assessed for safety impact and regulatory significance
Post-releaseMonitoring and bug fixesProblem resolution process, complaint handling, and maintenance plan

IEC 62304 in practice

IEC 62304 defines lifecycle processes for medical device software: development planning, requirements analysis, architectural design, detailed design, unit implementation and verification, integration and integration testing, system testing, and release. Alongside development sit software maintenance, risk management, configuration management, and problem resolution processes.

The standard assigns a software safety class — A, B, or C — based on the severity of harm that a software failure could contribute to. Class A software requires the least documentation; Class C requires the most, including detailed design and unit-level verification. Segregating high-risk functions into separate software items can let lower-risk parts carry a lighter class, but the segregation itself must be justified in the architecture.

SOUP: software of unknown provenance

Open-source libraries, operating systems, and commercial components not developed under your lifecycle are SOUP. IEC 62304 expects you to identify each item and version, specify the functional and performance requirements you rely on, and evaluate published anomaly lists for impact. A dependency upgrade becomes a documented change, not a casual bump.

Design controls

Design controls are the quality system mechanism that ties user needs to verified and validated product design. They include design planning, design inputs, design outputs, design review, design verification, design validation, design transfer, design changes, and a design history file that records it all.

For software teams the practical translation is: requirements are design inputs; code, configuration, and specifications are design outputs; tests prove outputs meet inputs (verification); clinical or simulated-use evaluation proves the product meets user needs (validation); and every change after baseline flows through a controlled process.

Traceability that engineers can live with

Traceability fails when it is a spreadsheet updated before an audit. It works when it lives in the tools engineers already use. Give requirements stable identifiers, reference them in commit messages and pull request templates, tag automated tests with the requirements and risk controls they verify, and generate the trace matrix from those links in CI.

Checklist

  • Every requirement has a unique, stable ID.
  • Each risk control maps to at least one requirement and one verification test.
  • Pull requests reference the requirement or change request they implement.
  • Automated tests carry requirement tags; the trace matrix is generated, not hand-maintained.
  • Gaps in the generated matrix fail the release pipeline.

Change control without paralysis

Regulated teams can still ship frequently. The trick is classifying changes by impact. A copy change in a help screen does not need the same scrutiny as a change to a dose calculation. Define change categories, the analysis each requires, and who approves.

For device software, changes must also be assessed for regulatory significance — whether the change could require a new premarket submission. FDA guidance on deciding when to submit a 510(k) for a software change to an existing device describes how manufacturers evaluate this, and predetermined change control plans offer a mechanism for certain planned modifications, notably for AI-enabled device software functions.

A disciplined SDLC for non-device healthcare software

Non-device products do not need IEC 62304, but borrowing its habits pays off when hospitals ask hard questions. A lightweight version looks like this:

  • Requirements with IDs and acceptance criteria, linked to tests.
  • Threat modeling for new features that touch PHI or external interfaces.
  • Dependency inventory and software bill of materials generated on every build.
  • Documented release notes customers can review before changes reach clinical users.
  • Post-incident reviews feeding back into requirements and tests.
  • Evidence retention aligned with the HIPAA documentation requirement to keep policies and related records for six years (45 CFR 164.316(b)(2)).

Agile inside a regulated lifecycle

IEC 62304 does not require waterfall. AAMI TIR45 provides guidance on applying agile practices to medical device software, and many manufacturers run sprints that produce documented, verified increments. The documentation is produced continuously as part of the definition of done rather than in a phase at the end.

What changes is the definition of done: a story is not done until its requirement is baselined, its risk impact assessed, its tests tagged and passing, and its design documentation updated. That is more work per story, but far less than reconstructing a design history file before a submission.

References

This guide is educational and is not legal or regulatory advice.

Frequently asked questions

What is the healthcare software development life cycle?

It is the set of processes used to plan, specify, design, build, verify, release, and maintain healthcare software. For non-device products it resembles a disciplined SaaS lifecycle with added security and privacy controls. For software that is a medical device, it operates under a quality management system, commonly following IEC 62304 with design controls and ISO 14971 risk management.

Does all healthcare software need IEC 62304?

No. IEC 62304 applies to medical device software. Many healthcare products, such as scheduling, billing, and most integration services, are not devices. However, practices borrowed from IEC 62304 — requirement IDs, traceability, documented releases, and controlled changes — help non-device products answer hospital security and quality questions.

What are IEC 62304 software safety classes?

IEC 62304 defines classes A, B, and C based on the severity of harm a software failure could contribute to. Class A involves no possible injury, Class B non-serious injury, and Class C death or serious injury. Higher classes require more rigorous documentation and verification, such as detailed design and unit verification for Class C.

Can regulated medical device teams use agile?

Yes. IEC 62304 does not mandate waterfall, and AAMI TIR45 describes how to apply agile practices within a regulated lifecycle. The key is expanding the definition of done to include baselined requirements, risk assessment, tagged and passing verification tests, and updated design documentation, so compliance artifacts accumulate continuously.

Discuss your healthcare engineering project

Tell us about the system, the integrations it depends on, and the constraints you are working within. A senior engineer will review it and reply with questions, not a sales script.